We require fees to supplement the costs associated with reviewing and processing Right of Way (ROW)

We require fees to supplement the costs associated with reviewing and processing Right of Way (ROW) Use permit applications and the inspection of work performed. The Board of County Commissioners (BOCC) sets the fees for ROW Use permits, and applicants must pay fees upon submission and approval of the application.

Paying fees

See the guide for using credit card payments online through the HillsGovHub portal.

If you wish to pay by check or money order, or cash, go to Development Services on the 16th Floor of the County Center Building at 601 E. Kennedy Blvd. in downtown Tampa.

Check and money orders should be made out to Hillsborough County Board of County Commissioners for the exact fee amount.

Legend:

  • < less than
  • > greater than
  • ≤ less or equal to
  • Ø diameter

Fees

Base Application

Fee

The base application fee is intended to supplement the County’s cost associated with the clerical, administrative, and engineering cost to process each permit, regardless of the permit application’s approval or disapproval.

  • All permit application requests require a $50 base fee.

$50

Access (Driveway) Application

Fee

Access Type I

  • Residential: Average daily traffic < 50 vehicles

$50

Access Type II

  • Commercial: 50 < Average daily traffic < 1,500 vehicles

$75

Access Type III

  • Commercial: Average daily traffic > 1,500 vehicles

$125

ROW Application (in addition to the base fee)

Fee

No Roadway Crossings

  • Open trench or trenchless work parallel to roadway

$150

Open Trench Roadway Encroachment or Crossing

  • Digging open trench in, across, or encroaching on road

$250

Trenchless Roadway Crossing ≤ 2” Ø

  • Crossing road, no open trench in road, boring under ROW with pipe or conduit ≤ 2” Ø

$100

Trenchless Roadway Crossing > 2” Ø

  • Crossing road, no open trench in road, boring under ROW with pipe/conduit > 2” Ø

$200

Open Trench Construction Fee

  • Open trench work parallel to roadway for excavations exceeding 10 linear feet not to exceed $500

$1 per linear foot

Supplemental large facility project (SFLP)

  • Structure > 75’ high or pole > 24” Ø

$1,000

Special Activity (in addition to the base fee)

Fee

Certain special activities which require full-time inspections during the course of the activity (directional drilling, jack and bore under major roadways, bodies of water, structures, etc.)

$300 per permit

Re-inspection (for projects requiring re-inspections in excess of the 5 allotted)

Fee

1st re-inspection

$150

2nd re-inspection

$300

3rd re-inspection

$600

Each additional re-inspection

$900

Re-inspection

Fee

Per square mile of service area

$27.50

Maximum fee

$25,000

Printable version

Download a printable version of the ROW fee schedule

Contact

For more information contact Development Services at (813) 272-5600.