Waste water project planned in Town N' Country
Waters Avenue Force Main Replacement Project is a critical pipeline that serves as a principal transmission main for wastewater from west of Manhattan Avenue along Waters Avenue to Sheldon Road. A 2021 assessment indicated compromised performance along the pipeline and concluded that its replacement is necessary to maintain reliable service for customers and environmental quality.
Project highlights include:
- Replacing the aging 24-inch force main pipeline along Waters Avenue.
- Installing Air Release Valves (ARVs) to prevent gas buildup and improve system performance.
- Protecting the environment by reducing the risk of leaks or system failures.
- Building the new pipeline to meet current Hillsborough County and Water Resource standards.
How will this project benefit the community?
- The project will provide several key benefits to the community, including:
- Improved reliability of wastewater service for residents and businesses along Waters Avenue.
- Reduced risk of service disruptions caused by aging or damaged infrastructure.
- Support for future growth in the North County Service area through upgraded capacity and modern infrastructure.
- Enhanced environmental protection by minimizing the potential for leaks or spills.
- Improved safety and efficiency with a pipeline designed to meet current standards and prevent gas buildup.
- Long-term cost savings by reducing emergency repairs and maintenance needs.
What is the project cost?
$24 million has been budgeted for the design and initial kickoff of construction for this project.
How long will the project take to complete?
The project is expected to be completed by early 2028.