Projects Planned at Miller Rd. and Dover/Little Rd.
Durant at Miller Rd. intersection improvements
- CIP Project #:69679020
Overview and objectives
- To improve transportation, mobility, and access for vehicles and pedestrians including retrofitting to comply with the Americans with Disabilities Act (ADA), the four-way stop intersection will be converted to a roundabout with turning movement improvements and pedestrian enhancements. Sidewalks will be updated to improve pedestrian safety, specifically ADA ramps, curbing, and pavement markings.
- Overhead diagram - Durant at Miller Rd. (PDF)
Current Phase
- Design
Estimated project schedule
- Design/Land acquisition completion: Early 2028
- Procurement completion: Late 2028
- Construction completion: Mid 2030
Project cost estimate
- Total: $4,794,776
- Planning: $4,957
- Design and Land: $2,658,747
- Construction: $2,131,072
Download a printable fact sheet for Durant at Miller Rd. intersection improvements (PDF)
Durant at Dover/Little Road intersection
- CIP Project #: 69679043
Overview and objectives
- To improve transportation, mobility, and access for vehicles and pedestrians including retrofitting to comply with the Americans with Disabilities Act (ADA), the four-way stop intersection will be converted to a roundabout with turning movement improvements and pedestrian enhancements. Sidewalks will be updated to improve pedestrian safety, specifically ADA ramps, curbing, and pavement markings.
- Overhead diagram - Durant at Dover/Little Road (PDF)
Current phase
- Design
Estimated project schedule
- Design/Land acquisition: Mid 2026
- Procurement completion: Early 2027
- Construction completion: Late 2028
Project cost estimate:
- Total: $4,461,219
- Design and Land: $1,251,225
- Construction: $3,209,994
Download a printable fact sheet for Durant at Dover/Little Road intersection (PDF)