Water, wastewater and reclaimed water technical manual
General
Section 1
Project Review and Acceptance Process
1.1 Introduction
- 1.2 Project Review Process
- 1.3 Right-of-Way Use Permit Submittals
- 1.4 Dedication of Easements
- 1.5 Authority of Inspectors
- 1.6 Requirements of Acceptance
- 1.7 Utilities Product Review Committee
Section 2
Preparation of Master Plans, Construction Plans, and Record Drawings
- 2.1 Master Plan
- 2.2 Construction Plan Format
- 2.3 Standard Items for Construction Plan Review
- 2.4 Record Drawing Submittals
Section 3
Specifications for Drinking Water Distribution Systems Design Standards
- 3.1 General
- 3.2 Plans Preparation
- 3.3 Plans Review
- 3.4 Project Acceptance
- 3.5 System Design and Flow Criteria
- 3.6 Water Details
Section 4
Specifications for Wastewater Collection/Transmission Systems Design Standards
- 4.1 General
- 4.2 Plans Preparation
- 4.3 Plans Review
- 4.4 Project Acceptance
- 4.5 System Design and Flow Criteria
- 4.6 Wastewater Detail
Section 5
Specifications for Reclaimed Water System Design
- 5.1 General
- 5.2 Plans Preparation
- 5.3 Plans Review
- 5.4 Project Acceptance
- 5.5 System Design
- 5.6 Reclaimed Water Details