#69692000
Quick Facts
- Location: Gibsonton
- Project Type: Roadway Corridor Improvements
- Phase: Design
Schedule
- Planning complete: N/A
- Design complete: Early 2026
- Construction begins: Late 2026
- Construction complete: Mid 2028
Budget Breakdown
- Total: $25,194,932
- Construction: $25,194,932
Overview
- This project will include resurfacing and widening of approximately 0.75 miles of existing 4-lane divided rural highway to build a 6-lane urban typical section with curb & gutter, closed drainage system, 10-foot sidewalks on each side, and median (11 feet – 36 feet). Also included will be the milling and resurfacing of Kings Lake Drive from Big Bend Road to approximately 400 feet north of Old Big Bend Road.
- Widening will also add a southbound left-turn lane. South of the Big Bend Road and Waterset Blvd. intersection, approximately 0.25 miles of a concrete trail (8 feet – 12 feet) will be constructed along Waterset Blvd. to connect the Scenic Drive Trailhead to the proposed sidewalk along the south side of Big Bend Road.
Objectives
- The purpose of this project is to improve capacity, enhance safety and provide operational improvements along the corridor.
Questions?
For more information about this project please contact (813) 635-5400 or visit At Your Service
Note: The cost and schedule data shown here are the County's current best estimates and are subject to frequent change. Changes (if any) are updated weekly.
Current as of 3/27/2026