#69679051
Quick Facts
- Location: Riverview
- Project Type: Intersections
- Phase: TBD
Schedule
- Planning complete: TBD
- Design complete: TBD
- Construction begins: TBD
- Construction complete: TBD
Budget Breakdown
- Total: $930,570
- Design and Land: $111,668
- Construction: $818,902
Overview
- Convert Westbound median from a single left turn lane to a dual left turn and eliminate the outside “right turn lane drop”; one of two outside right turn lanes.
- The existing westbound approach includes one left turn lane, two thru lanes, and two right turn lanes. Boyette Road is a 6-lane divided facility.
Objectives
- Recommendations of the westbound lane configurations to improve the westbound approach operation are proposed based on operation and capacity analysis results.
Questions?
For more information about this project please contact (813) 635-5400 or visit At Your Service
Note: The cost and schedule data shown here are the County's current best estimates and are subject to frequent change. Changes (if any) are updated weekly.
Current as of 5/9/2025