#69647000
Quick Facts
- Location: Multiple
- Project Type: Roadway Corridor Improvements
- Phase: Construction
Schedule
- Planning complete: Mid 2021
- Design complete: Mid 2024
- Construction begins: Early 2025
- Construction complete: Early 2027
Budget Breakdown
- Total: $44,704,145.33
- Planning: $1,860,209.17
- Design and Land: $5,693,936.16
- Construction: $37,150,000
Overview
- Corridor improvement for Big Bend Rd from US 41 to Covington Gardens Dr and from Simmons Loop to US 301 from a 4-lane divided road to a 6-lane divided road with enhanced bike, pedestrian and bus facilities.
- Enhance pedestrian safety features, including wide sidewalks and enhanced crosswalks and signals. Stormwater drainage will also be improved.
Objectives
- Better accommodate growth and traffic volume.
- Increase the overall mobility along Big Bend Road, while maximizing safety along the corridor.
- multipoint
- multipoint
Questions?
For more information about this project please contact (813) 635-5400 or visit At Your Service
Note: The cost and schedule data shown here are the County's current best estimates and are subject to frequent change. Changes (if any) are updated weekly.
Current as of 6/27/2025